Micron Technology

Global Facilities Construction Schedule Control Manager

Micron Technology
Integrated Device ManufacturingSingapore, SingaporeOnsitePosted 1 month ago

About the role

AI summarised

Drive compliance with global processes and procedures across all construction project activities, serving as the primary interface between planning, engineering, construction, procurement, and finance teams on scheduling and risk matters. This role involves leading schedule development, managing 4D BIM integration, and executing advanced project risk management.

IDMOnsiteFront End

Key Responsibilities

  • Accountable for driving compliance with defined Global processes and procedures across all construction project activities.
  • Develops and maintains comprehensive documentation, including process frameworks, audit reports, and project controls guidelines.
  • Serve as the primary interface between line planning, engineering, construction, procurement, and finance teams on all scheduling and risk matters.
  • Partner with the BIM team to ensure 4D BIM models are aligned with construction schedules and updated throughout the project lifecycle.
  • Collaborate with estimating teams on baseline schedule and cost integration.
  • Lead 4D BIM scheduling by integrating 3D models with project schedules to visualize construction sequences and optimize workflow planning.
  • Establish and enforce schedule governance standards, including WBS structure, activity coding, logic relationships, baseline management, and schedule health metrics.
  • Conduct regular Critical Path Method (CPM) analysis, float analysis, and schedule variance reporting.
  • Drive look-ahead scheduling (2-week, 4-week) in collaboration with field teams and contractors.
  • Perform schedule compression / acceleration analysis and evaluate time-cost tradeoffs using generative scheduling techniques.
  • Lead Risk Management: Develop and maintain the project risk register, including qualitative and quantitative risk assessments.
  • Execute probabilistic schedule risk analysis using Oracle Primavera Risk Analysis (PRA) — including Monte Carlo simulations, tornado chart analysis, and confidence level reporting (P50/P80/P90).
  • Identify and quantify risk drivers, model mitigation strategies, and recommend contingency levels for schedule and cost.

Requirements

  • Proven ability to manage fully integrated master project schedules.
  • Proficiency in industry-standard scheduling tools (Primavera P6, Microsoft Project).
  • Experience leading 4D BIM scheduling and integrating 3D models with project schedules.
  • Strong understanding of schedule governance standards (WBS, activity coding, logic relationships).
  • Expertise in CPM analysis, float analysis, and schedule variance reporting.
  • Demonstrated ability to perform probabilistic schedule risk analysis (Monte Carlo simulations).
  • Experience in scenario analysis and time-cost tradeoff evaluation.